How long does it take to install new flooring?

If you are planning a home remodel, timing matters almost as much as design. One of the first questions we hear at Lawson Brothers Floor Company is simple and fair: How long will new flooring actually take to install? 

 

The short answer is, it depends. The better answer is that with the right planning, experienced installers, and realistic expectations, flooring timelines can be very predictable. Since 1928, our family-owned team has helped homeowners and businesses across the St. Louis area plan flooring installation projects that stay on schedule and on budget. Let’s break it down so you know exactly what to expect. 

 

What factors affect how long flooring installation takes? 

 

No two flooring projects are identical. Several variables influence the timeline from start to finish. 

 

Room size is an obvious factor. A single bedroom installs faster than an open-concept main floor. The condition of the subfloor matters too. If leveling, moisture mitigation, or repairs are needed, that adds time. Furniture removal, demolition of old flooring, and the complexity of the layout also play a role. 

 

Material choice may be the biggest driver. Some floors install quickly with minimal prep. Others require multiple steps, curing time, or acclimation before the first plank is even placed. 

 

How long does hardwood flooring installation usually take? 

 

Hardwood flooring is a classic choice, but it is not a one-day process in most cases. 

 

For a typical room, installation alone often takes two to four days. However, solid hardwood usually needs time to acclimate to your home’s temperature and humidity before installation. That step can take three to five days. 

 

If the hardwood is site-finished instead of prefinished, add sanding, staining, and sealing. That can extend the timeline by another three to seven days. In total, hardwood projects often span one to two weeks from delivery to final walk-through. 

 

How long does it take to install engineered wood flooring? 

 

Engineered wood installs faster than solid hardwood in many cases. Because it is more dimensionally stable, acclimation time is often shorter or sometimes unnecessary, depending on the product. 

 

Most engineered wood floors can be installed in one to three days per average-sized room. If a floating installation is used, the process moves even faster. You still need time for prep and cleanup, but overall, engineered wood is a great option if you want the hardwood look with a tighter schedule. 

 

How long does tile flooring installation take? 

 

Tile installation is more labor-intensive and detail-driven. For kitchens, bathrooms, or entryways, expect three to five days for installation under normal conditions. 

 

Tile requires precise layout, cutting, setting, and grouting. After the tile is set, grout needs time to cure before heavy foot traffic. Larger-format tiles, intricate patterns, or natural stone can extend the timeline further. 

 

If waterproofing systems or heated floors are involved, additional days may be needed. Tile rewards patience with durability and style, but it is not the fastest option. 

 

How long do luxury vinyl or laminate flooring installations take? 

 

Luxury vinyl plank and laminate flooring are among the quickest options to install. In many cases, a professional team can complete the flooring installation in one to two days for an average room or floor level. 

 

These products often use click-lock systems and require less downtime. Once installation is complete, the floor is usually ready for use the same day. That makes vinyl and laminate popular for busy households or commercial spaces where speed matters. 

 

Does removing old flooring add time to the installation project? 

 

Yes, and it is often underestimated. Removing carpet, tile, or old hardwood can add anywhere from a few hours to a couple of days. 

 

Carpet removal is usually quick. Tile removal takes longer due to the mortar and debris. Old hardwood removal can be labor-heavy, especially if it was glued or nailed extensively. 

 

We always factor demolition into the project plan, so there are no surprises. 

 

How long does subfloor preparation take? 

 

Subfloor prep can be fast, or it can become the longest part of the job. Minor leveling or patching may only add a few hours. Significant moisture issues, structural repairs, or self-leveling compounds can add one to three days. 

 

Skipping this step is never a good idea. Proper subfloor prep ensures your new flooring performs well for decades, not just the first year. 

 

Can flooring be installed faster with professional installers? 

 

Absolutely. Experience matters. A professional flooring installation team follows an efficient process, anticipates challenges, and avoids mistakes that cause delays. 

 

At Lawson Brothers Floor Company, our flooring installers work with a clear plan and timeline. Because we have been installing floors in St. Louis homes and businesses for generations, we know how to move efficiently without cutting corners. 

 

What is the total timeline from consultation to completion? 

 

Installation is only one part of the process. From initial consultation to final cleanup, most flooring projects take two to four weeks. 

 

This includes selecting materials, ordering products, scheduling delivery, preparing the space, and completing installation. Custom products or specialty materials may extend the timeline, while in-stock options can move faster. 

 

How can homeowners prepare to keep the flooring installation project on schedule? 

 

Preparation makes a big difference. Clear the space as much as possible. Plan for pets and foot traffic. Confirm access times and parking for installers. Most importantly, choose materials early so ordering does not delay the schedule. 

 

We guide our clients through every step so expectations are clear from day one. 

 

Is faster always better when installing new flooring? 

 

Not always. Rushing installation can lead to gaps, uneven surfaces, or long-term issues. The goal is not speed alone. The goal is to do it right. 

 

With nearly a century of experience, we believe the best flooring projects balance efficiency with craftsmanship. When that happens, timelines stay predictable and results last. 

 

Contact our flooring store in St. Louis, MO 

 

If you are considering new floors, knowing the timeline helps you plan with confidence. At Lawson Brothers Floor Company, we take pride in clear communication, honest scheduling, and quality work that stands the test of time. Reach out to start planning your flooring installation project with experts who have been doing it right since 1928. Our flooring store in St. Louis, MO, serves the St. Louis area, including Clayton, Town and Country, Chesterfield, Frontenac, Wildwood, Richmond Heights, and Sunset Hills, MO.